What order should renovation work be done in?

A successful renovation is first of all a question of order. Each trade prepares the ground for the next, and every inversion is paid for in rework, delays and damaged finishes. Here is the timeline I follow, and what I have seen when it is not followed.

By Tom Klein, joiner and cabinetmaker Updated June 2026 Reading time: 6 min

The question looks simple, and yet it is the one that saves or sinks a project. The logic fits in one sentence: you go from structural to decorative, from dirty to clean, from hidden to visible. Everything that breaks, drills or wets comes before everything that shows. Here is the full sequence.

The timeline, step by step

The typical order of a full renovation. Depending on the project, some stages overlap, but they never swap places.
Stage What happens Why at this point
1. Demolition Removal of partitions, old coverings, fittings You discover the real condition of the building before committing to the rest
2. Structural work (gros œuvre) New openings, structural repairs, roof The messiest part, and everything else rests on it
3. Services First-fix electrics and plumbing, conduits, waste pipes Chases and holes are cut while walls and floors are bare
4. External joinery and insulation Windows, doors, insulation, membranes The building becomes airtight: drying and the secondary works can begin
5. Plastering Wall linings, partitions, ceilings, renders It closes up the services and gives the final volumes
6. Screed and floor substrates Screed, levelling compound, drying Cannot be compressed: a screed dries about 1 week per cm
7. Interior joinery and painting Doors, skirting boards temporarily set aside, paintwork You paint without fearing knocks from the heavy work
8. Floors and finishes Wood flooring, fine tiling, skirting boards, kitchen, sockets and switches The most fragile comes last, on a clean site

What happens when you swap the order: three failures seen up close

The wood floor laid too early. A beautiful solid oak floor laid on a screed that had not finished drying: six months later, the boards had cupped, curved like roof tiles. The was still releasing its moisture, and the wood drank it. Rework: full sanding when it can be saved, taking the floor up when it cannot, often more than €1,000. A simple moisture test would have been enough.

The bathroom tiled before the final plumbing. The tiler came through, then the client wanted to move the shower 40 cm. Brand-new tiling had to be cut open again to re-run a waste pipe. The stage does not forgive improvisation: you freeze the plans before, not during.

The painting before the electrician. Walls finished, then along came the American-style fridge that needed a dedicated circuit: a chase cut into a brand-new wall, a paint touch-up visible forever. A fortnight's delay for one socket.

The gold-underlined words are explained on hover. All definitions are in the joinery glossary.

The rules I do not negotiate

My honest opinion as a joiner, and I hold to it: floors last, always, and never mind if everyone is impatient to see the parquet. I have seen too many beautiful wood floors massacred by the trades that followed: the plasterer's ladder, a falling tile offcut, plaster ground into the grain of the wood. When a coordinator asks me to lay the floor 'to keep things moving', I say no. It is the most fragile item on the site and the most expensive to redo.

And who holds the order, in practice?

On paper, everyone agrees. In real life, the plumber is two days late, the plasterer turns up anyway, and the order explodes. That is why coordination is a real job: on my full renovation projects, you have a single point of contact who schedules the trades and checks every handover. And if you manage your own tradesmen, start with a pre-works advice visit: we set out the timeline of your project together, and you know who to call, and when. For the initial diagnosis of an old house, also read where to start renovating an old house.

Three questions that come up often

How long does a full renovation take?

For a house, allow 4 to 8 months of actual work depending on the surface area and the starting condition, not counting lead times for windows and doors and drying times that cannot be squeezed. Beware of over-optimistic schedules: a calendar that does not allow for the screed to dry is a false calendar.

Can you start with one room to move in sooner?

Yes, provided you respect the order within that zone and the services that cross it have already been run. You can finish a bedroom and a shower room so you can live on the site. What you cannot do is fit the finishes in a room that the conduits for the other rooms will have to cross again.

Who coordinates the trades when there is no architect?

Someone has to, otherwise it is you, by default, in the evening after work. On my renovation projects, I play that role: a single point of contact who schedules the electrician, the plumber and the plasterer in the right order, and who checks that each one leaves the site ready for the next.

Let's talk about your project

A renovation to organise in the Hautes-Pyrénées?

I come and see your project, we set out the timeline together, and you know exactly who steps in when. The quote is free and the decision is yours. I speak English, so feel free to call or write in English.

+33 6 03 57 45 47

Reply within 48 hours, or in writing: contact@agencementklein.fr

+33 6 03 57 45 47 contact@agencementklein.fr